PROJECT CONTROL FOR ENGINEERING CONTRACTORS
Capture field updates through Telegram and keep your project schedule current with a Gantt chart anyone on the team can maintain.
30 days. No credit card required.English interfaceBuilt for Malaysian project teams
THE DAILY REALITY
Updates exist, but they are scattered between messages, photographs and voice notes when the office needs a clear answer.
Project managers spend the end of the day copying field information into another document, introducing delay and omissions.
When every schedule change feels difficult, the Gantt slowly stops reflecting the work that is actually happening.
ONE OPERATING PICTURE
Rangka.co closes the gap between the communication coming from site and the schedule used to control the work.
FIELD REPORTING
Supervisors report through Telegram using a workflow they already understand. Rangka.co turns that communication into a clear, chronological site record without hiding the original evidence.
Morning boss, structure delivery arrived at laydown area.
Base plates installed at Grid 5.
Zone B about 70% complete. Continue tomorrow morning.
Structural materials delivered to the project laydown area.
Original message retainedWork recorded at Grid 5 with three progress photographs.
Linked to schedule activity 1.2Installation reported at approximately 70% complete.
Ready for PM reviewPROJECT SCHEDULE
Create activities, set dates, link dependencies and update progress in a few clear steps. Get a useful Gantt chart without heavyweight planning software or a fragile spreadsheet.
Updated from today’s site review
WHERE THE VALUE COMPOUNDS
Progress, photographs and context arrive from the team doing the work.
The PM sees the relevant site evidence while updating progress.
The report and schedule remain accountable to the same source information.
APPROVED PROJECT RECORDS
Rangka.co can organise the day and prepare a structured report draft. The project manager checks the facts, adjusts the wording and decides what becomes part of the approved record.
AI prepares the draft. The PM approves.Base plate installation continued at Grid 5 and reached approximately 70% completion.
Structural materials were received and placed in the designated laydown area.
12 original messages · 4 progress photographs · 2 contributors
BUILT FOR MALAYSIAN CONTRACTORS
Rangka.co is construction project management software for Malaysian engineering contractors. It captures site updates through Telegram, maintains project schedules with Gantt charts, and keeps the evidence behind every PM-approved daily report.
Rangka.co is construction project management software for Malaysian engineering contractors. It combines Telegram site reporting, project schedules with Gantt charts, and PM-approved project records.
Yes. Supervisors can send messages, photographs, and voice updates through a linked Telegram project group. Rangka.co organises the updates without removing the original evidence.
Yes. Project teams can create activities, set dates, connect dependencies, update progress, and start from reusable project schedule templates.
No. Rangka.co prepares a draft from the field record, but a project manager must review and approve it before it becomes an approved project record.
Paid plans start at RM199 per month and are based on active projects rather than per-user seats. A 30-day trial is available without a credit card.
FIELD UPDATES IN. PROJECT CONTROL OUT.